<--------------------------------------------------------------------------> Fri May 8 7:00-19:00 EDT 1998 C. Whalen, B. Bukala, J.Ryan, P. Schnitzenbaumer, C. Gardner. Iron beam was available to E919 for the entire shift minus 10 minutes due a test of the F10 Ejector PS. The ejector was verifed to be able to run at reference required to run at 600 MeV scheduled tentatively in the early morining hours. The EAGAL alarm program was disabled due a problem with false alarms. Digitalker is working. Tandem reset the HITL III ps controller. A few pulses of beam were lost during the reset. Files for 600 MeV run have been saved are available. The Booster MMPS controller appears to be hung (No active users listed). The controller needs to be reset and it is decided to delay resetting it. Bnl Power Consumption: 22.5 MWatts.